AS9102 FORMS PDF

AS/EN/SJAC Rev B First Article Inspection Form 1: Part Number Accountability. Sheet of. Form 1. A, B, C, D. 1, 1. Part Number: 2. Part Name: 3. AS/EN/SJAC Rev A First Article Inspection Sheet 1 of _. Form 1: Part Number Accountability Form 1, Rev A, Date: Oct 31, This SAE Aerospace Standard (AS) establishes documentation requirements for the First Article Inspection (FAI).The purpose of the First Article Inspection is to.

Author: Shakagul Samutaxe
Country: Jordan
Language: English (Spanish)
Genre: Life
Published (Last): 15 January 2005
Pages: 429
PDF File Size: 19.43 Mb
ePub File Size: 11.51 Mb
ISBN: 690-8-92810-178-1
Downloads: 18122
Price: Free* [*Free Regsitration Required]
Uploader: Faugrel

This form lists all the characteristics of the part, including characteristic requirements and corresponding inspection results.

The three AS forms are: If something goes wrong in the process, the company as99102 look back at the documentation to see exactly which part he needs to change. With all the specifications listed in the AS revision, and all the different fields that this form covers, it might seem difficult to understand which sections of the form must one complete before submitting it.

  APOSTILA PARKER HIDRAULICA PDF

Requirements for AS With all the specifications listed in the AS revision, and all the as9120 fields that this form covers, it might seem difficult to understand which sections of the form must one complete before submitting it. Importance of AS The AS document consolidates a series of forms to help ensure consistency across the board in aerospace technology and other engineering fields.

What is AS9102?

This form helps an engineer validate the new process and demonstrates how this new process will be used along side existing methods. Filling out and tracking these forms help companies ensure validity and reliability when introducing new parts.

Finally, characteristic accountability evaluates verification and compatibility.

Examples of optional information include the name of the person who prepared the FAI, the name of the person who approved the FAI, the date FAI is reported, and the name of the customer who approved everything. The part number accountability form designates specific names, serial numbers, and FAI report numbers for parts used in both the design and manufacturing process.

  CARDIOPATIAS CONGENITAS CIANOGENAS Y NO CIANOGENAS PDF

These measures help guarantee repeatability of the production of these products. Next, product accountability includes citation of raw material specifications, special processes, and functional testing. The AS document consolidates a series of forms to help ensure consistency across the board in aerospace technology and other engineering fields.

What is AS? | Usable Forms 1, 2, 3 – Definitions and Requirements

This new revision was meant to consolidate multiple requirement forms as well as improve the process and organization of these forms. Some fields that might be considered conditionally required include drawing number, additional changes, and designing tool. There are several advantages to companies adhering to this new standard.